View Full Version : Yahooooo! Get the regular approval soon.
way2usa
01-01-2002, 02:39 AM
hi kirthiga,
thanks for your reply. I hope that the RFE is not a big matter for you and our case will be approved soon.
Yes I have registered myself using my EAC-number and you can also find me on http://www.path2usa.com/immigration/premium/visawatcher/dwn_vis_f06_list.php
cheers
hi
i got a mail from uscis stating
on august 10th , we requested additional material ......like that .this notice will be sent to our employer/attorny. they will clear it.
i have registered in uscis site with my receipt notice nmuber EAC***. hope u have also registered with ur receipt number .
thodu
06-14-2006, 02:59 AM
Uscis processing time was updated.Those, who are filed in april will get the approval soon.Here is the link
https://egov.immigration.gov/cris/jsps/Processtimes.jsp?SeviceCenter=Vermont
those who are get the approval. pls post it here.
Waiting for approval
thodu
srieen
06-14-2006, 05:41 AM
really its a Good news....
i have filed on April 7th ....:)
thodu
06-14-2006, 05:51 AM
April 2 is on sunday.i think, nobody does not have the receipt nbr with this date.then INS is processing what?Don't know????:confused:
its_129
06-14-2006, 06:30 AM
Hi,
My employer said that they filed on 7th Apr 06.
Online rec. # (EAC************) shows 27th April (e.g.).
So, Do I have to compare 27th Apr or 7th Apr with today's case processing date of VSC (Apr 02) ?
Dsrini
06-14-2006, 11:20 AM
I have filed on April 24th.
Thank You for ur post
Dsrini
KangYu
06-14-2006, 11:42 AM
my friend filied on may-30 and got on 6 -june in Premium Processing.
vaskiran
06-14-2006, 10:39 PM
U have given that ur friend filed on 30 May .But USCIS has given that quota completed on May 26.Hor ur frind filed on 30 May
Please clarify
usgc4me
06-15-2006, 03:22 AM
Thanks for the update...I had stopped checking a cpl of days back since they had a march update from quiet some time..
hope april clears off in a month as it took almost same time for march to get current..
Ca center has the same processing times too..
ameeth_kodali
06-15-2006, 08:41 AM
Where can i check when my Application is been Filed by the Receipt No.
Can any Body Help me please by give the URL
srieen
06-15-2006, 10:28 AM
you can check your H1 Status
https://egov.immigration.gov/cris/caseStatusSearchDisplay.do
you need to have your Application Receipt No...
Al the best :)
prasvi
06-15-2006, 12:43 PM
Hey
Good news!! kewl...:)
My receipt date was on april 24th.
srieen
06-21-2006, 03:07 AM
H1processing Date are updated to June 20 th :) :) :)
https://egov.immigration.gov/cris/jsps/Processtimes.jsp?SeviceCenter=Vermont
thodu
06-21-2006, 03:42 AM
USCIS processing time updated to june 20
https://egov.immigration.gov/cris/js...Center=Vermont
But vermond is processing the same week :mad:
ssss63
06-21-2006, 06:51 AM
Hi srieen , thodu,
My employer filed on 05 may 06. My procs center is vermont too. may I know ur sponsors.
srieen
06-21-2006, 07:02 AM
Cool Buddy...
as i have filed on 7th Apl 06...
i expecting in 1st week of july....
any how u willl get it on 2nd week ( i thnk not Sure) u may get earlier or go late.... :eek:
regards
Sri
ssss63
06-21-2006, 07:14 AM
BTW srieen,
u forgot to leave ur sponsor
srieen
06-21-2006, 07:34 AM
i dint get u ssss63 ?
what u meant actually ?
ssss63
06-21-2006, 07:35 AM
srieen
who is ur employer?
srieen
06-21-2006, 07:49 AM
legacy-soft
what abt you ?
ssss63
06-21-2006, 06:33 PM
visiontss.co
thodu
06-21-2006, 11:46 PM
Hi srieen/chiyan,
I have filed on 24th april 06.USCIS website says that received on 5th may.
srieen,your expectation is correct.i saw an another thread says that filed on 4th april and got the approval on 20th june.
Don't forget to post,once u got the approval.
Best of luck!!!:)
Cheers!
thodu
jiggy
06-22-2006, 02:15 AM
Dear thodu,
You mentioned that you saw a petition that was filled on 4th April and has been approved on 20th June. So any idea whether this 4th April is the received date or the notice date.
There are two dates on the receipt, one being the received date and the other the notice date. In my case the received date is 3rd April and the notice date is 12th April.
So going by the equation when should I expect my petition to be approved.
Thanks & Regards
thodu
06-22-2006, 02:27 AM
I am not sure jiggy.i saw the thread in the following link
http://murthyforum.atinfopop.com/4/OpenTopic?q=Y&a=tpc&s=1024039761&f=4234032861&m=4201076621&p=2
see the thread posted date june 21
thodu
06-27-2006, 06:15 AM
Hi srieen,prasvi,ssss63,jiggy
did u get the approval? if yes, pls post here.
Thanks!:)
srieen
06-27-2006, 09:58 AM
hi Thodu,
its still underprocessing....
Not yet approved....:confused: :confused: :confused:
SVW123
06-27-2006, 01:48 PM
Hi guys....today i checked my status online...it says
"On June 27, 2006, we transferred your I129 PETITION FOR A NONIMMIGRANT WORKER to an office in TEXAS SERVICE CENTER for processing. That office has jurisdiction over the case. They will send you a written decision as soon as processing is complete. You should receive a notice informing you that your case has been transferred to a local office."
Pls let me know, does it interprete more than just transfer to another location???
I am confused!!!!
Thanks
SVW123
prasvi
06-27-2006, 02:26 PM
Hi Thodu, SVM123
I checked my status today. It the same message as appeared for SVM123.
"On June 27, 2006, we transferred your I129 PETITION FOR A NONIMMIGRANT WORKER to an office in TEXAS SERVICE CENTER for processing. That office has jurisdiction over the case. They will send you a written decision as soon as processing is complete. You should receive a notice informing you that your case has been transferred to a local office."
Now Texas Service Center shows processing with receipt dates March 31st. Any guesses how much time it takes to get processed?:confused:
-Prasvi
SVW123
06-27-2006, 02:38 PM
Hi Prasvi..
urs was also Vermont Centre?
when was ur application submitted?
Regards,
SVW123
raja_king
06-27-2006, 10:07 PM
Any Idea when we can expect the Approval for applications submitted in 1st week of May?
I hope the link given in this thread does not get updated frequently !!!
its_129
06-28-2006, 12:47 AM
Hi Prasvi & SVW123
May I know your received date ?
My appl. is at VSC and I have read ur responses on this thread.
Thanks you.
prasvi
06-28-2006, 12:55 AM
SVW123 - Ya! My petition was transfered from Vermont to Texas service center. Did u contact ur employer about this status?
its_129 - My receipt date was April 24th
I guess the processing dates have moved beyond april 2nd but the uscis website shows april 2nd processing date. It may not have updated.
its_129
06-28-2006, 12:58 AM
SVW123 - Ya! My petition was transfered from Vermont to Texas service center. Did u contact ur employer about this status?
its_129 - My receipt date was April 24th
I guess the processing dates have moved beyond april 2nd but the uscis website shows april 2nd date processing date. It may not have updated.
Thanks you again and for very sharp rpl.
Well, mine is at VSC and is on 28th of Apr.
U got my point saying they are beyond 24th...thats what i wanted to guess.
Thanks you.
srieen
06-28-2006, 02:47 AM
hi guys..
iam bit suprising in my case... in my case i have filed on 7 Apl 06 @ Vermont
but i have not updated any status like transfering to Texas Service Center etc..
iam really confused :rolleyes: and dont know how long it would take to approve... :p :p
its_129
06-28-2006, 03:02 AM
I am guessing they r selecting cases randomly.
SVW123
06-28-2006, 01:38 PM
in my case i have filed on 7 Apl 06 @ Vermont and notice date is 21st Apr
SVW123
06-28-2006, 01:41 PM
Hi prasvi, No i have not contacted my employer....did ya get in touch with them?
what they have to say?
i will also contact them today...
Pls let me know any updates in your case
way2usa
06-28-2006, 06:05 PM
But the cap was reached on May 26th? How could he do that?
my friend filied on may-30 and got on 6 -june in Premium Processing.
ssss63
06-28-2006, 07:46 PM
Hello Prasvi, thodu, srieen,
My appln date is 05 may 06
Center : Vermont
I checked the status today
it says "Your I129 PETITION FOR A NONIMMIGRANT WORKER was received on May 5, 2006. We will mail you a decision as soon as processing is complete. You can use our processing dates to estimate when this case will be done. Follow the the link below for current processing dates"
thodu
06-29-2006, 12:52 AM
Hi
My received date is 05 may 06.
there is no change in the status,it is showing the same as "Your I129 PETITION FOR A NONIMMIGRANT WORKER was received on May 5, 2006. We will mail you a decision as soon as processing is complete. You can use our processing dates to estimate when this case will be done.
Follow the the link below for current processing dates".
after i read all the above threads, i guess vermond is processing beyond 28th april.If its continue,i will get the approval with in a week or 2.
but little bit confused few friends saying that,"they filed in 7th april but still didn't get the approval yet"
is it vermond picking up the petitions randomly and approve it? don't know ???:confused: God only knows.
waiting......
thodu
prasvi
06-30-2006, 02:49 PM
Hi,
My status has again changed today. It shows
"On June 30, 2006, your I129 PETITION FOR A NONIMMIGRANT WORKER was received here for processing. We will mail you a decision as soon as processing is complete. You can use our processing dates to estimate when this case will be done."
On 27th, my petition was transfered to Texas Service Center from Vermont Service Center.
Does the date of transfer count for current processing? or receipt date?
Hope this transfer does'nt go to start again. Any guesses???
Prasvi
prasvi
06-30-2006, 03:06 PM
Please look at this site -
http://careers.the-scientist.com/index.cfm?attributes.fuseaction=employer.display&id=808&flag=16
way2usa
07-02-2006, 07:15 AM
Is it usual that those service centers work so lamely slow? I guess in general we must wait for at least 3 months until our case is approved. :(
Why do they still work that slowly even though every applicant pays processing fee for regular application as well? That large number of H1B applicants this year is a lame excuse that they can not work fast! :mad:
Uscis processing time was updated.Those, who are filed in april will get the approval soon.Here is the link
https://egov.immigration.gov/cris/jsps/Processtimes.jsp?SeviceCenter=Vermont
those who are get the approval. pls post it here.
Waiting for approval
thodu
srieen
07-03-2006, 10:45 AM
hey way2usa
Just be Cool. we have waited almost 2 and a half months..
lets wait for couple of week. we will get a good result...
:) :) :)
Srieen
sarasai
07-03-2006, 02:50 PM
Hi
my application was submited on May 9.Any gues by what time my papers will be processed.And how many days it takes for those who applied in April to get there processing comepleted so that may month applicaitons will be processed.
thanks
sara
saisai
07-03-2006, 03:43 PM
Masters/Advance degree quota is still available.
But the cap was reached on May 26th? How could he do that?
way2usa
07-03-2006, 06:22 PM
hey Srieen,
if you say that then it's ok because you applied earlier than me :)
however we don't pay for nothing... and let's see if there will be a good result for all of us in the next couple weeks :)
Cheers
srieen
07-04-2006, 03:11 AM
Guys
iam not sure you know this information or not..
just check this thread, is very intresting...
Path2usa Forums > Visa & Immigration > H and L Visa related >Query regarding Visa appointment
Srieen
heyitsme812003
07-04-2006, 05:47 AM
i filed on apr 10th .I havent recd receipt no or any notification .
Vermount center.
Will i also be getting in 2nd week of july?
is it ok that if i dont get any receipt no...?
Cool Buddy...
as i have filed on 7th Apl 06...
i expecting in 1st week of july....
any how u willl get it on 2nd week ( i thnk not Sure) u may get earlier or go late.... :eek:
regards
Sri
srieen
07-04-2006, 06:53 AM
hey sri,
First you get your Receipt Number from your Employer..
based on the Filed Date, We can predict the Approval Date...
Gud Luck :) :)
srkonline82
07-04-2006, 12:02 PM
Hi Everyone,
I have the same problem my case was filed on May 30 2006,i want to know when the case will get proceesed.I want to know the approximate time.I already made an appointment with US consulate (Chennai)
Please reply its very urgent
Regards
Rakesh
srieen
07-05-2006, 03:58 AM
Rakesh
can you pls tel how you did your web Appoinment Process.. ?
while submitting my Petition i seleted for Delhi Consulate.
can you pls suggest ? or email to srieen@gmail.com
Regards
Srieen
srkonline82
07-05-2006, 07:13 AM
hi sireen just log on to https://vfs-usa.co.in and book an appointment by selecting apply for non immigrant visa and then it will ask u for bep user so select no for that.
the rest of the things r easy.
raja_king
07-05-2006, 02:46 PM
Is there any news of approvals recently?
Did any of the members got the approval recently?
Please keep us posted with the approval information.
-King
smitharaju
07-05-2006, 06:45 PM
We got approval on June 27th.
Receipt Date : 14th April 2006
Center: Vermont
ssss63
07-05-2006, 11:26 PM
Sithraju
is it by normal or premium procsing?
srieen
07-06-2006, 10:47 PM
Hi Guys,
Great News My Application is Approved
Filed Date : 7th Apl 2006
Center : Vermont
Type : Regular
:) :) :)
Regards
Sri
prasvi
07-06-2006, 11:22 PM
Congrats Sri!!
Any other in regular processing got approval?
Hi Guys,
Great News My Application is Approved
Filed Date : 7th Apl 2006
Center : Vermont
Type : Regular
:) :) :)
Regards
Sri
srieen
07-06-2006, 11:52 PM
Yes prasvi
i think CIS guys are doing good volume in daily processing
Sriram : EAC-06-135-**468
Myfrnd : EAC-06-135-**507
almost they are processing more than 40 cases per day.
Al the best Guys.... :)
thodu
07-07-2006, 12:01 AM
Congrats:) Sri and best of luck for your stamping.
srieen
07-07-2006, 12:10 AM
Thank you guys.
let we all meet in US....:) :) :)
prasvi
07-07-2006, 01:34 AM
My receipt date is 24th april filed at vermont...transfered to texas on 27th...
can anyone say...how the case will be processed? will it wait till the processin date reach june 27th or will they take into consideration the receipt date?
Yes prasvi
i think CIS guys are doing good volume in daily processing
Sriram : EAC-06-135-**468
Myfrnd : EAC-06-135-**507
almost they are processing more than 40 cases per day.
Al the best Guys.... :)
way2usa
07-07-2006, 03:14 PM
hey sri,
congratulations!!! :) :) :)
now you can make the appointment without concern anymore ;) and best lucks!
raja_king
07-10-2006, 01:54 PM
Hearty Congratulations to all who have got approvals this month !
Are there any other recent approvals?
Please keep us posted. It helps us a lot!
Dsrini
07-10-2006, 04:33 PM
I got H-1 approval today morning.Even though uscis site still says that current processing (notice)date for texas center is march 31 st I got approval (my notice date- Apr 28th)
What I did was I created an account in uscis site by giving my email id so once it got approved they sent me an email.
Note- Couple weeks back I got an email stating that they had moved my case from vermont center to texas center
Thanks
DSrini
raja_king
07-10-2006, 07:17 PM
Congratulations Srini !!
Can you please let me know, when you got the mail stating that your case was moved to texas?
thodu
07-11-2006, 02:49 AM
Congrats:) srini
Dsrini
07-11-2006, 12:21 PM
Raja,
On June 28th I got that email and on July 10th I got approval
Thanks
Dsrini
its_129
07-11-2006, 01:37 PM
congrats Dsrini. :)
prassh123
07-12-2006, 01:41 AM
Guess they've updated the processing times in the site on Jul 11. But i am wondering as to why Vermont center still says "Apr 2nd". Any ideas or thoughts??
vijaymiriyala
07-12-2006, 10:26 AM
Texas center is still showing as March 31, 2006. But I guess they are approving some of the cases. Though they are claiming that the USCIS website gives the current processing time lines, we can ignore those dates for Texas center. I don’t know what is happening. May be Texas center is processing other centers forwarded applications. My wife’s case is filed on April 27, 2006 at Texas center; I think that I still need to wait for one more month.
sumanraju
07-13-2006, 03:02 PM
Guys,
Could anyone let me know the current processing dates at Vermont.
My receipt date is APR25th.
Is there anyone who are done with approvals ON or AFTER APR25th @ VERMONT.
USCIS site is hopeless.It still shows APR02.They should update that on a daily basis.
Awaiting ur responses and that helps estimation of my approval.
Thanks
Suman
raja_king
07-13-2006, 05:10 PM
I Got Approval mail from USCIS on Jul 13. My receipt date is May 2.
Hope you guys can estimate the processing time depending upon these dates.
-Raja
way2usa
07-13-2006, 06:46 PM
hey raja_king,
congratulations... :) :) :) and best lucks for visa stamping
what was your service center?
would you please enter your H1B info on:
http://www.path2usa.com/immigration/premium/visawatcher/dwn_vis_f06_list.php
it would be appreciated by everyone...
cheers
I Got Approval mail from USCIS on Jul 13. My receipt date is May 2.
Hope you guys can estimate the processing time depending upon these dates.
-Raja
Murali
07-13-2006, 06:55 PM
Please post your H1 approval and processing status related detailked information into
- H (H1/H4) Visa Processing tracker
at :
http://www.path2usa.com/immigration/premium/visawatcher/dwn_vis_f06_list.php
This way it is easy and comprehensive enough for all of you.
Thanks for your cooperation in advance.
raja_king
07-13-2006, 07:08 PM
Hi Murali,
It is vermont service center and mine is a normal processing. It just took 2 months and 11 days for processing.
Best of Luck to all you guys !
Hope to see you all in USA soon
Raja
pvsnagaraju
07-13-2006, 08:29 PM
hi raj,
my receipt date on the web site is 17 mayand serv center is vermount .can you please tell me the the three digits after eac06***.my three digits are 168.can you pls reply.:) :) .congrats for success
raja_king
07-13-2006, 08:40 PM
Nagaraju,
it is 750. I hope its in a different sequence.
anyways, i wish you best of luck
pvsnagaraju
07-13-2006, 09:49 PM
hi raja,
can you pls let me know your reciept date as per uscis website.thnx..
raja_king
07-13-2006, 10:52 PM
Nagaraju!
My Receipt date is may 2.enjoy!
thodu
07-13-2006, 11:37 PM
Congrats!!!! RAJA:)
srieen
07-14-2006, 01:25 AM
hey raja
did you blocked the date for Web Appoinement....?
Sri
raja_king
07-14-2006, 03:39 AM
Hii Srien
I am looking forward to block visa dates. Iam in no hurry, but, I wish to get a date as early as possible.
cheers
Raja
sumanraju
07-14-2006, 09:02 AM
Hi Raja,
Congrats !!
I just want to understand if the processing is done on a Serial basis or random basis.
Bcoz my receipt date is APR25th which is still Pending.
Any inputs?..
Thanks
Suman
its_129
07-14-2006, 09:27 AM
hi all,
I am sorry but request to close this thread from where it is started and where its going. so many ppl will divert in wrong direction otherwise.
regards,
Hitesh.
srieen
07-14-2006, 02:01 PM
Uscis processing time was updated.
https://egov.immigration.gov/cris/js...Center=Vermont
al the BEST.....
Sri
shailuP
07-14-2006, 02:49 PM
its_129,
Your suggestion is very improper.
This forum is very useful. In particular this thread is very useful.Unnecessarily terminating it might cause lot of inconvenience.
The more the number of people vieweing the thread the more useful it is for other members.
its_129
07-15-2006, 12:10 AM
hi ShailuP.
Thanks for posting ur first message on board. It was kind request.
Good Luck.
srieen
07-15-2006, 03:22 AM
hey Hitesh
cool ......
thodu
07-18-2006, 12:46 AM
hi guys,
any more approvals?:) :)
csharpguru
07-18-2006, 04:45 AM
I am tired and frustrated waiting for H1B approval and then again wait for H1B interview.What a waste of time.
I should have applied for UK instead.
mprabhanj
07-19-2006, 12:10 PM
Hi,
My employer said that they filed on 7th Apr 06.
Online rec. # (EAC************) shows 27th April (e.g.).
So, Do I have to compare 27th Apr or 7th Apr with today's case processing date of VSC (Apr 02) ?
hi,
u should consider as 27th of april. in form i797 u will get the date as 27th april. well, mine was on 24th april and got approval date as 13th june in i 797. hope u too would receive soon. good luck!
regards
prabhanj
mprabhanj
07-19-2006, 12:16 PM
hi,
i applied on april 24th and got the approval on 13th june in normal processing.
hope, the aspirant h1bees would receive their ones soon! but remember! u can still book the appointment with your EAC.... number! good luck!
regards
prabhanj:)
its_129
07-20-2006, 12:23 AM
Hi mprabhanj,
As of 20 Jul the VSC shows Apr-02 as processing date. And I did not have my h1 approval yet. I am wondering so many people are still waitig for their approval. :confused:
do i need to ask my employer whats going on?
shailuP
07-21-2006, 04:38 PM
any new approvals?
-Shailaja
prasvi
07-22-2006, 03:35 PM
Hi all,
As in my previous message, my receipt date was april 24th at vermont center...moved to texas on jun 27th. On july 21st, i got mail from USCIS
"On July 21, 2006 the appropriate American Consulate or port of entry was notified by cable, telephone, or fax of the approval of this case."
What does this mean?? Any one knows this??
Prasvi
its_129
07-23-2006, 11:12 AM
hi,
u should consider as 27th of april. in form i797 u will get the date as 27th april. well, mine was on 24th april and got approval date as 13th june in i 797. hope u too would receive soon. good luck!
regards
prabhanj
I got an RFE so worried and dont know how much time it take. :(
http://forum.path2usa.com/forum/showthread.php?t=15404
prasvi
07-24-2006, 01:27 AM
hi...can anyone say whatz does the below status mean?
Hi all,
As in my previous message, my receipt date was april 24th at vermont center...moved to texas on jun 27th. On july 21st, i got mail from USCIS
"On July 21, 2006 the appropriate American Consulate or port of entry was notified by cable, telephone, or fax of the approval of this case."
What does this mean?? Any one knows this??
Prasvi
prasvi
07-24-2006, 07:26 AM
Hey!! My case was approved.:) Big relief after long wait. I jst got mail from USCIS.
My case was filed in vermont with receipt date 24th april and transfered to texas center on 27th june and now got mail from uscis that it is approved.
prasvi
idlebrains
07-24-2006, 10:19 AM
Hi guys... My receipt date is 11th of May and am still waiting for my approval at vermont :( hope some one with latest approvals from vermont can through some light on which date is currently going on at Vermont.
Thanks
RagZ!
SVW123
07-24-2006, 02:58 PM
Hi guys,
I just got mail from USCIS regd Approval status after long wait
Reciept Date== 8th April
Notice date== 21st April
tranfered to Texas== 27th June
Approval Date== 24th July
Regards,
SVW123
raja_king
07-24-2006, 04:30 PM
Congratulations to Prasvi and SVW !!!
rajsundu1
07-25-2006, 10:56 AM
Hi,
For both me & my wife H1B has been filed by different employers (24th & 26th May). Is't advisbale to fix Visa Interview appointment for both together? In that case if anyone got refused can we apply for H4? Please help me in this regard.
Thanks, [/FONT] [/FONT]
thodu
07-26-2006, 11:24 PM
Hi Guys,
My receipt date is May'05.My case has been transferred to Texas center on july26.does anybody in the same situation?
prasvi
07-26-2006, 11:30 PM
Thank you raja_king
Thodu - Dont worry ur case will be soon approved in the mid of august. My case was also transfered from Vermont to Texas on jun 27th, i got approval on july 24th. Keep up!! You will get soon...
-Prasvi
Hi Guys,
My receipt date is May'05.My case has been transferred to Texas center on july26.does anybody in the same situation?
thodu
07-27-2006, 12:54 AM
Thanks!:) Prasvi
ssss63
07-27-2006, 08:54 AM
Hello Thodu,
Mine too,
Receipt date : 05 may 2006
Tx'fer date : 26 July 2006
Current Status: waiting for approval.
way2usa
07-27-2006, 06:33 PM
Hi Thodu,
me too same receipt date and transfer date.
why don't you share your information on:
http://www.path2usa.com/immigration/premium/visawatcher/dwn_vis_f06_list.php ?
Hi Guys,
My receipt date is May'05.My case has been transferred to Texas center on july26.does anybody in the same situation?
thodu
07-28-2006, 12:45 AM
Hi Frederik,way2usa,prasvi
I have updated my info in the tracker list.
btw,when will you expect the approval?(prasvi says mid of august)
did you book your appointment?
ssss63
07-28-2006, 03:37 AM
Hello Thodu,
My guess, approx it will take from 12 - 26 days to get the approval
with regards,
prasvi
07-28-2006, 04:12 AM
Thodu,
Due to bispecialization some applications are transfered to other centers like vermont to texas.
Most cases which are transfered to TX on jun 27th were approved within 25 working days i.e. by july 24th. So i assume you may also get before end of august.
I m waiting for my papers to be received by hand before i take appointment. I am not in a hurry and waiting for my employer to give me the petition details that are to be filled while taking appointment.
-Prasvi
csharpguru
07-28-2006, 11:38 AM
Hi Guys,
My receipt date was 28 April and Notice Date is 9 May . When should I except my H1B approval ?????????
sumanraju
07-28-2006, 02:47 PM
Hi,
I got the approval.
My receipt date is 25th Apr @ Vermont.
All the best to everyone.
Regards
-Suman
way2usa
07-28-2006, 03:05 PM
congratulations and best lucks for stamping.
by the way was your cased transfered to the Texas Service Center?
sumanraju
07-30-2006, 04:10 AM
No thats a straight approval from Vermont.
Good luck.
-Suman
kirthiga
07-30-2006, 08:36 PM
hi sumanraju
congratulations for ur approval. r u working in india ??
i havnt received my approval
my receipt date is on april 27th at vermont.
still i am waiting .... when can i receive ...any idea ???
sumanraju
07-31-2006, 12:37 PM
Hi kirthiga,
Thanks.
Well,dont worry about that...U may expect the approval anytime this week.(thats a guess).
U must understand that this is not purely a SERIAL BASED APPROVAL concept,which means a person who applied after U did(Regular Application),may receive the approval earlier than you.
Even I know a situation where in a MAY 3rd Application(Regular) @ Vermont got approved some 20 days back and mine got approved only last Thursday.
So just dont think about it..U will get it approved very soon.
In the meanwhile go ahead and schedule the Consulate appointment with your PETITION #.Hope U did this by now.
Cumin to me,I work in Bangalore...what abt u?..
My email : sumanraju@gmail.com ...feel free to mail on any questions..(that will be helpful to me either)
Regards
-Suman
Rao98
07-31-2006, 02:00 PM
Hi Guys,
My receipt date is May'05.My case has been transferred to Texas center on july26.does anybody in the same situation?
Hi Thodu,
Mine is same case, i got the same update stating case transfered from Vermount to texas on july 26th. My receipt date is May 6th.
raja_king
08-01-2006, 04:33 PM
Congratulations to all those people who have got their approvals.
For those who have not yet received their approvals, I wish you best of luck and we hope you all get your approvals soon!
-King
idlebrains
08-01-2006, 04:48 PM
On August 1, 2006, we transferred your I129 PETITION FOR A NONIMMIGRANT WORKER to an office in LINCOLN, NE for processing. That office has jurisdiction over the case. They will send you a written decision as soon as processing is complete. You should receive a notice informing you that your case has been transferred to a local office.
I think there is nothing else i can do but just wait... ! My receipt date is May 11th and transfer date from VERMONT is Aug 1st...
way2usa
08-01-2006, 07:36 PM
so ... there was a lot of idle time in vermont right? ;)
On August 1, 2006, we transferred your I129 PETITION FOR A NONIMMIGRANT WORKER to an office in LINCOLN, NE for processing. That office has jurisdiction over the case. They will send you a written decision as soon as processing is complete. You should receive a notice informing you that your case has been transferred to a local office.
I think there is nothing else i can do but just wait... ! My receipt date is May 11th and transfer date from VERMONT is Aug 1st...
idlebrains
08-02-2006, 08:42 AM
oh! yes.. there was just a lot of idle time. I wish not there is any more!!
Cokidi
08-02-2006, 09:17 AM
Good news
Rao98
08-02-2006, 02:18 PM
Hi
I Got mail from USICS, On 26th July i got mail stating that petition was transfered to Texas.
On July 28, 2006, your I129 PETITION FOR A NONIMMIGRANT WORKER was received here for processing. We will mail you a decision as soon as processing is complete. You can use our processing dates to estimate when this case will be done. Follow the the link below for current processing dates.
idlebrains
08-03-2006, 02:13 AM
is that a typo? Were you trying to saying you got a mail on 28th July?? or your petition got transferred to Texas on 26th july? and btw when is your receipt date ?
Cool_KK
08-03-2006, 05:57 AM
Hi
What does it mean my case transfered on 1st of august to Lincoln.
They will send written decision after processing
what does it mean ?
Rgds
KK
Rao98
08-03-2006, 07:07 AM
is that a typo? Were you trying to saying you got a mail on 28th July?? or your petition got transferred to Texas on 26th july? and btw when is your receipt date ?
My receipt date is 6th May.
Rao98
08-03-2006, 08:23 AM
My receipt date is 6th May.
Hi,
My case has been approved, my recipt date is 6th May.
Current Status:
This case has been approved. On August 3, 2006, an approval notice was mailed. If 30 days have passed and you have not received this notice, you may wish to verify or update your address. To update your address, please speak to an Immigration Information Officer during business hours.
Cheers
H42H1
08-03-2006, 03:33 PM
Hi Rao98,
I too got mails from USICS, On 26th July stating that petition was transfered to Texas and On July 28, 2006, your I129 PETITION FOR A NONIMMIGRANT WORKER was received here for processing. We will mail you a decision as soon as processing is complete. You can use our processing dates to estimate when this case will be done. Follow the the link below for current processing dates.
Any idea when can i get my H1 approved?
My Receipt date is may 4th.
Thx,
SVW123
08-03-2006, 05:29 PM
All ppl whose application got tranfered to texas or any other centre..need not worry....
You will get approval within 4 weeks.
Mine was similar case
All the Best!!
SVW123
ssss63
08-03-2006, 10:42 PM
Hi H42H1,
I too got mails from USICS, On 26th July stating that petition was transfered to Texas and On July 28, 2006, your I129 PETITION FOR A NONIMMIGRANT WORKER was received here for processing. We will mail you a decision as soon as processing is complete. You can use our processing dates to estimate when this case will be done. Follow the the link below for current processing dates.
Any idea when shall we get our H1 approved?
My Receipt date is may 5th.
Thx,
Rao98
08-04-2006, 07:20 AM
Hi H42H1,
My case got transfered to Texas on 26th July(Receipt Date 6th May), and got approved on 3rd Aug, that means with in one week i got approval after transfering to texas.
Cheers
Saritha
H42H1
08-04-2006, 02:26 PM
Hi Saritha,
Congratulations! and All the Best.
Thanks for ur reply.
Hi ssss63,
I think its just luck.Bcoz some people got their approval within one month
after their cases transferred to texas and in Rao98(saritha) case she got approval within one week after her case tranferred to texas.
So we just have to wait with our fingerscrossed.Lets hope for the best.
Thx.
Rao98
08-04-2006, 05:31 PM
Hi H42H1,
Thanks
Hope you will get it soon.
Cheers
Saritha
ssss63
08-04-2006, 06:12 PM
Congrats Saritha.
way2usa
08-04-2006, 07:09 PM
Hi Saritha,
congratulations and best luck for stamping... :) :) :) :)
Hi H42H1,
My case got transfered to Texas on 26th July(Receipt Date 6th May), and got approved on 3rd Aug, that means with in one week i got approval after transfering to texas.
Cheers
Saritha
kirthiga
08-04-2006, 09:08 PM
hi
thanks for your reply.
I am working in japan. still waiting for approval.
sometimes i worry why i didnt get my approval. sometimes i dont care .
let me wait and see
Have a good day
regards
Hi kirthiga,
Thanks.
Well,dont worry about that...U may expect the approval anytime this week.(thats a guess).
U must understand that this is not purely a SERIAL BASED APPROVAL concept,which means a person who applied after U did(Regular Application),may receive the approval earlier than you.
Even I know a situation where in a MAY 3rd Application(Regular) @ Vermont got approved some 20 days back and mine got approved only last Thursday.
So just dont think about it..U will get it approved very soon.
In the meanwhile go ahead and schedule the Consulate appointment with your PETITION #.Hope U did this by now.
Cumin to me,I work in Bangalore...what abt u?..
My email : sumanraju@gmail.com ...feel free to mail on any questions..(that will be helpful to me either)
Regards
-Suman
Murali
08-05-2006, 02:34 AM
If your case is transferred to another seervice center.
Read this :
http://www.path2usa.com/news/newsdetails.php?nws_id=44
Rao98
08-05-2006, 11:02 AM
Thanks SSSS63, Wa2usa.
i got visa appointment for sept 1st in London. i am going to attend for h1 and h4 for my spouse on same day.now i am looking for required docs for visa.
Cheers
saritha
raj_007
08-07-2006, 01:28 AM
Hi,
I got my H1B petition approved. Here are the details
Type: Fresh H1B Regular
Receipt date: 4 May
Converted to premium processing on 26 July
Transfered to TSC on 26 July
Received in TSC on 28 July
Approved on 4 Aug
All the best for guys who are waiting for their approvals. Just hang on .. its coming !
Raj
ssss63
08-07-2006, 04:55 AM
Hello Saritha,
All the Best!!!!!!!!!!!
when I was in London, I thought of taking appointment there, due to my personal issues, I came to india . I am gonna take my intw in chennai.
Small info 4 u:
when I was there, 2 of my friends got 221g due to certificate evaluation.
Sometime VO may as you, Do u want to process ur visa here or in ur home town?, if they say they have AAP due to certificate eveluation, its better to get back the appln and goahead with ur hometown embassy bcoz,one for my friends they took the original certificates, nearly 7 months ago, no reply from them, for the other guy 12 months passed, no response.
The VO in London, they r pretty cool, dont compel them to procees ur case there, though they said it will take long time.
ssss63
08-07-2006, 04:56 AM
Hello H42H1, SVW123, Kirthiga, thodu, way2usa, Sahil
is there any update in your cases????
please share ur info plz
thodu
08-07-2006, 05:47 AM
Hi Ericsson,
my last updated date in uscis on Aug1,2,3 and Aug6.
waiting.....
Rao98
08-07-2006, 09:55 AM
Hello ssss63,
Thanks for your information.
one my colleagues got h1 from here on june 2005, when i am applying for h1 i have given port of entry as UK, so i think they may not ask me to go to my hometown.
lets see how it goes, i got interview date for sep 1st.
Cheers
saritha
kirthiga
08-07-2006, 07:50 PM
hi
i am still waiting for approval
my receipt notice date is 27th april @ vermont
no transfer etc.
worried
ssss63
08-07-2006, 08:32 PM
Hello Kirthiga,
Dont worry abt it, you will get it soon.
vijaymiriyala
08-08-2006, 02:12 PM
Hi,
My wife's H1B got filed on April 27, 2006 (receipt date) at Texas Service Center and got the approval on August 7, 2006. It's a regular processing.
Thanks,
Vijay
girish.sh
08-09-2006, 04:39 AM
Hi, mine receipt date is 28th April and still its not Approved, Same old message is coming that "Your application is received on 28th april and let you know the decision soon etc etc" does anyone know why they are taking so much time? is there anything to worry about?
kirthiga
08-09-2006, 04:42 AM
hi
please if anyone knows clarify
the last updated column in my a/c shows 08/08/2006 (USCIS webpage)
what does this column mean ? any guess
thanks in advance
kirthiga
08-09-2006, 04:47 AM
hi girish
have u checked ur last updated column in ur a/c ?
my receipt notice date is on 27th april @ vermont.
i am also waiting ... so i feel now that i am not alone
can u pls check and tell me ur last updated date ?
we all will get approval soon ...dont worry
girish.sh
08-09-2006, 06:03 AM
AMEN.
hi girish
have u checked ur last updated column in ur a/c ?
my receipt notice date is on 27th april @ vermont.
i am also waiting ... so i feel now that i am not alone
can u pls check and tell me ur last updated date ?
we all will get approval soon ...dont worry
ssss63
08-09-2006, 06:54 AM
Hello,
My receipt date is 5th may 06,
Tx'fer to TSC on 26th july,
Received by TSC on 28th july,
My last update shows 08th Aug.
ssss63
08-09-2006, 07:08 AM
Hi Kirthiga,
Thanx a lot, Eventually I made it. Please check my previous post and reply.
girish.sh
08-09-2006, 10:20 AM
Hi my last updated date shows "07/26/2006 ".....what is yours?????
rajsundu1
08-10-2006, 10:41 AM
HI,
The members mentioned below along with their receipts dates in the bracket got approved it seems. So why the USCIS website showing the processing dates nowhere near to the actual approval dates?
H1B_2007 (22nd May)
durga_prasad (18 May)
dublin_ie1 (13th May)
campuschill (7th May)
Rao98 (6th may)
Pls. help.
Rao98
08-10-2006, 11:30 AM
HI Raj,
USICS website processing dates are not updated since long time.My recipt date was 6th May and got transfered to 26th july to texas service center then approved on 3rd August.
cheers
saritha
kirthiga
08-10-2006, 08:58 PM
Hi
on august 10th ... uscis asked additional info for my case.
bit worried ..... how many days it will take for processing ? any guess ...
anyone faced similar situation please explain
hi its_i29, hitesh
what happend to ur case? u have mentioned that uscis asked for additional info on july 20th ... have u got ur approval ?
its_129
08-11-2006, 04:14 AM
i am waiting for approval ? what they asked u ?
hitesh.
kirthiga
08-11-2006, 04:37 AM
hi
i didnt know what they have asked . i mailed to my employer regarding this. yet to receive msg from them.
whether ur employer sent ur addln info required to uscis ? when? and have u received any acknowledgment mail from uscis abt ur addln info received like that ?
how many days it took for u for the whole process ?
sorry for so many ?ions . just want to guess still how many days i have to wait . :(
way2usa
08-11-2006, 03:00 PM
hi kirthiga,
how did you know that USCIS has demanded RFE? Do you see that on the case status website?
Hi
on august 10th ... uscis asked additional info for my case.
bit worried ..... how many days it will take for processing ? any guess ...
anyone faced similar situation please explain
hi its_i29, hitesh
what happend to ur case? u have mentioned that uscis asked for additional info on july 20th ... have u got ur approval ?
kirthiga
08-11-2006, 07:28 PM
hi
i got a mail from uscis stating
on august 10th , we requested additional material ......like that .this notice will be sent to our employer/attorny. they will clear it.
i have registered in uscis site with my receipt notice nmuber EAC***. hope u have also registered with ur receipt number .
H42H1
08-14-2006, 02:17 PM
Quota:Regular ,normal processing
Receipt date:May 4th
Service center:VSC
Transferred to:Texas on july 26th
Case:H4 to H1 with change of status
Approved :August 14th
Thx,
sripathi_shashidhar
08-15-2006, 05:34 AM
Quota: Regular, normal processing and new application
Receipt date:8th May
Service center:VSC
Status: Approved on August 14th
Thank everyone who ran this thread till date.
regards,
kaaty
08-15-2006, 11:40 AM
Quota:Regular ,normal processing
Receipt date:May 4th
Service center:VSC
Transferred to:Texas on july 26th
Case:H4 to H1 with change of status
Approved :August 14th
Thx,
Congrats to all you have got H1 :)
My date is almost same as yours (May 5th) but havent heard anything :( waiting .....
way2usa
08-15-2006, 07:02 PM
hey kaaty...
same here... my notice date is may 5, 2006. :confused:
I know other fellows who have the same notice date and their cases haven't been approved yet... :(
I believe that there is something wrong with the processing of the cases with notice date may 5, 2006. :mad:
way2usa
08-15-2006, 07:05 PM
hi there,
congratulations and best luck for stamping! :)
Btw, was your case moved to the Texas service center?
Quota: Regular, normal processing and new application
Receipt date:8th May
Service center:VSC
Status: Approved on August 14th
Thank everyone who ran this thread till date.
regards,
way2usa
08-15-2006, 07:06 PM
hi there,
congratulations and best luck for stamping! :)
Quota:Regular ,normal processing
Receipt date:May 4th
Service center:VSC
Transferred to:Texas on july 26th
Case:H4 to H1 with change of status
Approved :August 14th
Thx,
H42H1
08-15-2006, 07:56 PM
Hey Kaaty and way2usa,
Thanks! and All the best for guys who are waiting for their approvals. Lets hope for the best.
Thx,
manonsong
08-15-2006, 11:55 PM
Hi there,
Got my H1 approved today. here are my details...
Quota: Regular, normal processing and new application
Receipt date:6th May
Service center initial:VSC
Moved to TSC on :28th July
Status: Approved on August 15th
regds,
MOS
thodu
08-16-2006, 01:12 AM
Hi guys,
Got my H1B approved mail today.:D :D :D :D
here are my details...
Quota: Regular, normal processing and new application
Receipt date:5th May
Service center:VSC
Moved to TSC on :26th July
Last Updated Date:28,29,31st July...1,2,3,4,5,6,7,14,15 th Aug
Status: Approved on August 15th
All the Best for others.
Cheers!
thodu.
kirthiga
08-16-2006, 01:23 AM
congrats THODU
you started this thread and it was really useful to many
wish you the best to get successful stamping.
thodu
08-16-2006, 06:18 AM
Thanks Kirthiga:cool: and all the best for your approval:)
way2usa
08-16-2006, 09:41 AM
Hi Thodu,
congratulations and best luck for stamping! :)
We have exact the same dates (notice date, date of transfering from VSC to TSC and date of receival for processing by TSC).
Do you still remember when you case had been updated before it was approved on 08/15/2006?
Thanks.
kaaty
08-16-2006, 01:17 PM
and all others who got approval.
My date is also 5th May waiting....waiting....
BTW the update date is the date specified at the bottom of https://egov.immigration.gov/cris/caseStatusSearchDisplay.do;jsessionid=b-cqy87s5iHb site right?
Mine is 08-16-2006 12:11 PM EDT currently
way2usa
08-16-2006, 01:44 PM
Hi,
same here.
The update date is displayed on the portfolio if you have registered yourself on the Case Status Online site (see attached scree shot)
and all others who got approval.
My date is also 5th May waiting....waiting....
BTW the update date is the date specified at the bottom of https://egov.immigration.gov/cris/caseStatusSearchDisplay.do;jsessionid=b-cqy87s5iHb site right?
Mine is 08-16-2006 12:11 PM EDT currently
kaaty
08-16-2006, 02:28 PM
Hi,
same here.
The update date is displayed on the portfolio if you have registered yourself on the Case Status Online site (see attached scree shot)
Thanks so much :) after logging in my update is 08/07/2006 :( dunno why??
way2usa
08-16-2006, 03:07 PM
Thanks so much :) after logging in my update is 08/07/2006 :( dunno why??
No problems. Mine was updated on 08/06/2006 as you can see on the screen shot and 08/06/2006 was sunday... :confused:
Now let's hear what thodu will say about the last update date before the approval date :)
kaaty
08-16-2006, 05:00 PM
No problems. Mine was updated on 08/06/2006 as you can see on the screen shot and 08/06/2006 was sunday... :confused:
Now let's hear what thodu will say about the last update date before the approval date :)
See they are working hard :D :rolleyes:
way2usa
08-16-2006, 05:21 PM
See they are working hard :D :rolleyes:
hope that they are not only working hard but will also approve our petitions very soon :cool:
Btw you could also put your info on http://www.path2usa.com/immigration/premium/visawatcher/dwn_vis_f06_list.php so everyone can take advantage from those statistics :)
thodu
08-16-2006, 10:54 PM
Thanks Guys,
Hi way2usa,
My last updated date in USCIS website is on 08/07/2006 after that 08/14/2006.
I got the approval on 08/15/2006.
All the best for others! and my small advice is "Be patient".:cool:
Cheers!
thodu
way2usa
08-17-2006, 03:35 AM
hi thodu,
thanks again and best luck for stamping! :) :) :)
Thanks Guys,
Hi way2usa,
My last updated date in USCIS website is on 08/07/2006 after that 08/14/2006.
I got the approval on 08/15/2006.
All the best for others! and my small advice is "Be patient".:cool:
Cheers!
thodu
kaaty
08-17-2006, 12:58 PM
Hi Guys,
Got my approval today ...thanks a ton for sharing information
My details
Recipt @ VSC - 5thMay -> 26July - TSC and approval on 17th aug
Last updatd date was 7th Aug after that straight approval notice on 17th
way2usa
08-17-2006, 02:35 PM
Hi Kaaty,
congratulations!!! :) and best luck for stamping...
my case hasn't been approved until now..., let's see what will happen on the next days...
Hi Guys,
Got my approval today ...thanks a ton for sharing information
My details
Recipt @ VSC - 5thMay -> 26July - TSC and approval on 17th aug
Last updatd date was 7th Aug after that straight approval notice on 17th
kaaty
08-17-2006, 04:59 PM
Hi Kaaty,
congratulations!!! :) and best luck for stamping...
my case hasn't been approved until now..., let's see what will happen on the next days...
Thanks....I think its a matter of days...so dont worry :) and all d best
pvsnagaraju
08-24-2006, 06:53 AM
Hi Guys,
Got my approval today ...thanks a lot for sharing information
My details
Recipt @ VSC - 17thMay
Last updatd date was 20 may after that straight approval notice on 22 aug.
vava123
08-24-2006, 01:55 PM
Hi way2usa,
i am facing same situation .my receipt date is may 8th.still waiting:o
way2usa
08-25-2006, 12:08 PM
strange :cool:
I've got a feeling that in general female fellows would get the approval easier than the male fellows...
I hope our case will be approved soon... keep cool :rolleyes:
Hi way2usa,
i am facing same situation .my receipt date is may 8th.still waiting:o
way2usa
08-26-2006, 01:46 PM
hi there,
congratulations and good luck for stamping! :) :) :)
and thanks for the information...
Hi Guys,
Got my approval today ...thanks a lot for sharing information
My details
Recipt @ VSC - 17thMay
Last updatd date was 20 may after that straight approval notice on 22 aug.
Cool_KK
08-28-2006, 12:27 AM
Hi
My reciept date is 11th May and case transfer to NB on 10th August.
Still waiting for approval.
If anyone with the near date waiting for approval ?
Please share
regds
KK
Cool_KK
08-28-2006, 12:27 AM
Hi
My reciept date is 11th May and case transfer to NB on 10th August.
Still waiting for approval.
If anyone with the near date waiting for approval ?
Please share
regds
KK
prassh123
08-28-2006, 12:33 AM
Yup...me too...receipt notice at Vermont is 10th of may and that in Nebraska is 7th of Aug....Still pending.
idlebrains
08-28-2006, 01:45 AM
Good to know you Cool_KK and prassh123...!
My reciept date is 11th May and case transfer to NB on 8th August.
Still waiting for approval.
So guys... you have company... lets hope we get our approvals some time this week..!
idlebrains
08-28-2006, 01:52 AM
Prash and Cool_KK ... where are you guys from?? I am from Bangalore..
Cool_KK
08-28-2006, 02:39 AM
hi
I am from Delhi.. My date at Nerbreska is 10th August .
I don't know why these pepole are taking lot of time .
Please keep on posting on your approval status.
when are you expecting it. ? I want to take the dates of sep mid..
rgds
KK
prassh123
08-28-2006, 03:05 AM
I am from chennai but work there in bangalore.
idlebrains
08-28-2006, 01:20 PM
@Cool_KK
Same case here.. dont know why they are taking soo long for approval..
I feel sept mid is way too early for a date.. As after the approval, the docs would be dispatched to Employer and who would inturn mail them to us with supporting docs.. I am sure it would take a month for this process to happen... So dont hurry dude and wait for docs.. Just my opinion..
@prassh123
I work in blore but am from Visakhapatnam.. neeways.. send a ping mail to glraghukishore@gmail.com
way2usa
08-28-2006, 05:58 PM
Guys,
let's enter/update our status on http://www.path2usa.com/immigration/premium/visawatcher/dwn_vis_f06_list.php
so we can get a better and statistical overview of the approval trend.
thanks a lot.
Hi
My reciept date is 11th May and case transfer to NB on 10th August.
Still waiting for approval.
If anyone with the near date waiting for approval ?
Please share
regds
KK
Cool_KK
08-29-2006, 12:20 AM
Hi Idlebrains/prash123/way2usa
Yes, I know it will take time, My marriage is fixed on 20th sep, so i want to get it done before that, suppose I am not able to do that then I think I have to show and modify alot of details.
Like marriage certificate etc and also have to apply for H4 for my wife, which currently I don't want as she is having valid h1b.
what you suggest guys.
way2usa: I will update once the approval is done on tracking tool
rgds
kk
gstreak
08-29-2006, 01:54 AM
Hi guys,
I have been reading this thread for over a month now. Thanks to all for sharing their experiences.
I got my approval email today.
My receipt date was 17th May at Vermont.
I guess they are just taking their own sweet time so be patient and all the best.
Thx
vava123
08-29-2006, 08:09 PM
strange :cool:
I've got a feeling that in general female fellows would get the approval easier than the male fellows...
I hope our case will be approved soon... keep cool :rolleyes:
Hi way2usa,
i am also a female still waiting for approval.
way2usa
08-30-2006, 04:46 PM
Hi vava,
it was my assumption because all people I know who won GC lottery are female.
Btw have you case status been updated since the last updated date?
Hi way2usa,
i am also a female still waiting for approval.
manongBidoy
08-31-2006, 10:04 PM
Got my H1B approved mail today.
here are my details...
Quota: Regular, normal processing and new application
Receipt date:27th May
Service center:VSC
Last Updated Date:31th Aug
Status: Approved on August 31th
All the Best for others.
Cheers!
Manong Bidoy
rajsundu1
09-01-2006, 03:46 AM
My Application date : 26th May (Regular)
Receipt date : 30th may
Status : Transferred to Texas center on 27th
On August 30, 2006, your I129 PETITION FOR A NONIMMIGRANT WORKER was received here for processing. We will mail you a decision as soon as processing is complete. You can use our processing dates to estimate when this case will be done. Follow the the link below for current processing dates.
Rao98
09-01-2006, 06:45 PM
Hi SSSS63,
I got my Visa in london, they did not see my certificates at all.
Cheers
Saritha
Hello Saritha,
All the Best!!!!!!!!!!!
when I was in London, I thought of taking appointment there, due to my personal issues, I came to india . I am gonna take my intw in chennai.
Small info 4 u:
when I was there, 2 of my friends got 221g due to certificate evaluation.
Sometime VO may as you, Do u want to process ur visa here or in ur home town?, if they say they have AAP due to certificate eveluation, its better to get back the appln and goahead with ur hometown embassy bcoz,one for my friends they took the original certificates, nearly 7 months ago, no reply from them, for the other guy 12 months passed, no response.
The VO in London, they r pretty cool, dont compel them to procees ur case there, though they said it will take long time.
ssss63
09-04-2006, 07:58 PM
Hi Sareetha,
Congrats, All the best...
Btw where are your in US?
Rao98
09-05-2006, 07:38 AM
hi SSSS63,
Thank You, employer is in PA, mostly i will go there.
Cheers
Hi Sareetha,
Congrats, All the best...
Btw where are your in US?
vinay
09-05-2006, 07:15 PM
hi guys
my receipt date is 24th may at vermont my case was transfered to texas and was received there on the 17th of aug .................still waiting for an approval.any guys in a similar situation??? also can anyone give me an estimate as to how long it might take???
cheers
vinay
idlebrains
09-08-2006, 01:44 AM
Cool_KK and prassh123...!
Any update on your petitions... No update from my side.. I think Nebraska guys.. have forgotten us :(
./raghu
prassh123
09-08-2006, 01:15 PM
Right! No updates from my side....Think we need to look at alternatives now :)
idlebrains
09-08-2006, 01:45 PM
Dont worry Prassh!! Hamara number bhi ayega :) hopefully very soon!
way2usa
09-08-2006, 03:17 PM
Hi all,
my H1 case has finally been approved after more than 4 months!!! It was a very very long waiting time...
Thank you all so much who have suggested and supported me. :) :) :)
I promise I'll be right back to share my interview experience!
Best of luck for all fellows who are still waiting for the approval. I believe that it's more or less only about our patience...
idlebrains
09-08-2006, 09:25 PM
Congrats way2usa... Its great news... Best of luck with your interview!!
way2usa
09-09-2006, 07:02 AM
Congrats way2usa... Its great news... Best of luck with your interview!!
thanks :) and you too... best of luck! :)
idlebrains
09-18-2006, 09:02 PM
Hey guys.... Its my turn to share my happiness. I had got an accept on Friday on 15th.
reciept date is 11th May
case transfer to NB on 8th August
Accept on 15th September.
Thank you for all the help.. Will be back with Stamping experiences.
prassh123
09-19-2006, 12:50 AM
Cool Idlebrains!!! I havent received anything yet..!!
How abt Cool_kk??
idlebrains
09-20-2006, 12:29 AM
Prassh! Tumara number bhi ayega.. Its just a matter of time...
Cool_KK
10-16-2006, 03:37 AM
Hi
I was not online for more then a 25 days.
I ahven't recieved approval notice.
It's shows 10th August'06 case transfer date to Nerbeska But no Info ...
Any idea
rgds
KK
prassh123
10-17-2006, 11:29 PM
Hi Cool KK
Guess you will need to be a little more patient coz i received my approval from Nebraska on the 3rd of Oct. Think NB has become real slow in their processing. I guess i got it sooner because, mine was upgraded to the premium processing mode. Not sure if my employer or Vermont Service center did that!
- Prashanth
Cool_KK
10-18-2006, 12:37 AM
Hi Prash
Thanks for replying back.
I too got approval yesteraday in regular processing.
I will update the tracker also.
Yes, Nerbaska Center worked at snail pace.
All the best for visa stamping.
When you are planning to take dates and to which center you are going.
Do share your experience.
Best Regards
KK
vBulletin® v3.6.4, Copyright ©2000-2009, Jelsoft Enterprises Ltd.